History

Our history

timeline_pre_loader
The story so far

2022

Titan Wind Energy celebrates 10 years anniversary in Denmark.

2020

Titan Wind Energy (Europe) A/S acquired Ambau’s production facility in Cuxhaven. Thereby Titan are ready to enter the Offshore foundation market from this ideal location with direct access to the North Sea.

2019

Titan Wind Energy (Europe) A/S supplies 80 monopoles, 10 cast-in sections and 90 masts to the Danish electricity grid.

2018

Titan Wind Energy (Europe) A/S starts by producing steel structures in various sizes.

2017

Titan Wind Operational Support ApS is established and starts by providing various services, such as on-site inspection and repair as well as advice related to production and project management.

2015

The surface treatment facility in Esbjerg is being upgraded so that the entire process from sandblasting to painting takes place under the same roof.

2014

Titan Wind Energy (Europe) A/S buys the surface treatment facility in Esbjerg from Gardit A/S.

2013

The prototype of Vestas V164 is supplied by Titan Wind Energy (Europe) A/S and later that year, Titan Wind Energy (Europe) A/S is approved as a supplier to Siemens Wind Power.

2012

Titan Wind Energy division in Singapore takes over the factory in Denmark and the first tower is then produced with Titan Wind Energy (Europe) A/S as owner.
Titan Wind Operational Support
Contact us today

Want to know more?

If you do not find enough information about your desired task here on our website, you are always very welcome to contact us for a non-binding chat and possibly an offer for the task.</p >

Call us by phone (+45) 70 70 71 50 or send an email to titan@titan-wind.com. We will answer your inquiry as soon as possible.